assam
- providing electro mechanical installation / services and safety security works for infrastructure works of iaf sites under nfs project project at tezpur (for package -ii refurbishment site) (sh :- sitc of addressable / intelligent fire alarm & fire detection system) (sh:- carrying out balance work at cost & risk of m/s. neo precision engineering & security pvt. ltd., delhi) (2nd call)
- Deadline : 11 May 2026
- Updated : 01 May 2026
- Value : See Document
assam
- providing electro mechanical installation / services and safety security works for infrastructure works of iaf sites under nfs project project at chabua (for package-2 refurbishment site) (sh :- sitc of addressable / intelligent fire alarm & fire detection system). (sh:- carrying out balance work at cost & risk of m/s. dogra & dogra enterprises, delhi) (2nd call)
- Deadline : 11 May 2026
- Updated : 01 May 2026
- Value : See Document
maharashtra
- construction of 3 nos 9.0metre roof top pole structure on roof of vinod kadm building at mumbai naka, nashik.
- Deadline : 13 May 2026
- Updated : 01 May 2026
- Value : See Document
madhya pradesh
- hoisting of available 9.00 meter three pole tower assembly for new rented site at geeta colony under ujjain oa of ba ujjain
- Deadline : 08 May 2026
- Updated : 01 May 2026
- Value : See Document
himachal pradesh
- repairing top overhauling and servicing of dg sets at various sites under sdot rampur in shimla ba at bts dipelakhumbtaklech rampur mw and te rampur
- Deadline : 11 May 2026
- Updated : 01 May 2026
- Value : See Document
assam
- sitc of addressable / intelligent fire alarm & fire detection system for various ifa nfs sites under bsnl assam (02 sites) and ne (02 sites) (location :nfs site jorhat pkg-i)(sh:- carrying out balance work at cost & risk of m/s. glyptic, bardhaman, west bengal) (2nd call)
- Deadline : 11 May 2026
- Updated : 01 May 2026
- Value : See Document
himachal pradesh
- provisioning and maintenance of pm wani compliant wi-fi hotspots with 2 ap (access points) in each of the 30 tribal villages of hp circle (without core) on revenue share basis
- Deadline : 22 May 2026
- Updated : 01 May 2026
- Value : See Document
uttaranchal
- corrigendum for providing services of upkeep and maintaining enquiry and records of bsnl o/o chief engineer (e), se(e), o/o ee(e) & o/o sde(e) at telephone exchange laxmi road dehradun
- Deadline : 12 May 2026
- Updated : 01 May 2026
- Value : See Document
west bengal
- providing electrical installation works at karangapara bts durgapur under asansol ba
- Deadline : 06 May 2026
- Updated : 01 May 2026
- Value : See Document
west bengal
- repairing/replacement of faulty fans and other accessories of existing free cooling system at different te & bts sites in suri oa under asansol ba.
- Deadline : 06 May 2026
- Updated : 01 May 2026
- Value : See Document
Subscribe / Membership
