uttar pradesh
- sitc of 6 x 3 tr inverter type ductable split ac units in transmission room and olt nfs room at main te sitapur. sh providing power supply and assosiated work
- Deadline : 31 Dec 2025
- Updated : 26 Dec 2025
- Value : 1.50 Lac
west bengal
- installation, testing & commissioning of the 1.5 tr split ac unit at a specified location by mounting/fitting indoor and outdoor unit at their respective locations, laying and fixing of both liquid and hot gas lines, inter connecting wiring for both indoo
- Deadline : 05 Mar 2026
- Updated : 02 Mar 2026
- Value : See Document
west bengal
- installation, testing & commissioning of 1.5 tr metal body inverter type ductable air-cooled split ac unit at a specified location complete with all accessories i/c laying and fixing of both liquid and hot gas lines, inter connecting wiring for both indoo
- Deadline : 15 Jul 2025
- Updated : 03 Jul 2025
- Value : See Document
telangana
- extension of power supply to mv panels and changeover over arrangement for ht to lt conversion in te buildings at nirmal, armoor and bodhan in nizamabad ba
- Deadline : 18 Jul 2025
- Updated : 12 Jul 2025
- Value : 2.51 Lac
karnataka
- power supply extension to bts and shifting of electrical items lt panel ac units dg set from dto te building at benaka complex sheshadripuram bengaluru
- Deadline : 25 Jul 2025
- Updated : 21 Jul 2025
- Value : 86 Thousand
uttar pradesh
- replacement of damaged power supply cable and distribution switches, replacement of damaged cables/wires of various sub meters in telephone colony civil lines oa gorakhpur
- Deadline : 02 Aug 2025
- Updated : 23 Jul 2025
- Value : 2.38 Lac
uttar pradesh
- sitc of 5x 3 tr inverter type ductable split ac units at main te lakhimpur . sh providing power supply and assosiated work
- Deadline : 31 Dec 2025
- Updated : 26 Dec 2025
- Value : 1.29 Lac
west bengal
- supply of installation, testing & commissioning of the 1.5 tr split ac unit at a specified location by mounting/fitting indoor and outdoor unit at their respective locations, laying and fixing of both liquid and hot gas lines, inter connecting wiring for
- Deadline : 29 Jan 2026
- Updated : 16 Jan 2026
- Value : See Document
west bengal
- supply of installation, testing & commissioning of the 1.5 tr split ac unit at a specified location by mounting/fitting indoor and outdoor unit at their respective locations, laying and fixing of both liquid and hot gas lines, inter connecting wiring for
- Deadline : 23 Feb 2026
- Updated : 15 Feb 2026
- Value : See Document
rajasthan
- supply of sitc of 40 kva (each power module shall be less than 10 kva) capacity at full load (unity power factor) at operating temperature 0 to 40 deg c, relative humidity 0 to 95 percenatge, online double conversion true sine wave uninterrupted hot swapp
- Deadline : 02 Mar 2026
- Updated : 25 Feb 2026
- Value : See Document
Subscribe / Membership
